Filters

Homepage / Projects / Renewable Energy Kazakhstan

Renewable Energy Kazakhstan

Renewable Energy

These renewable projects aim to produce electricity using renewable sources such as solar power plants and wind energy. In Kazakhstan, the energy is dispatched to the national grid, supporting the country’s ambitious goal to procure 50% of its energy from renewable sources by 2050.

These projects reduce the anthropogenic emissions of greenhouse gases (GHGs) into the atmosphere associated with the equivalent amount of electricity generation from the existing grid-connected power plants (mostly fossil fuel) by adding new generation sources into the grid.

The projects generate 146 MW in Khazakhstan


The Solar Power

Standards
LocationKazakhstan
Project Life15 years including 5 years of breakdowns
Emission reductions426,640 tons of CO2e
Installed capacity48 MW
SDGs

The Wind Power

Standards
LocationKazakhstan
Project Life30 years
Emission reductions3,449,860 tCO2
Installed capacity96 MW
SDGs

Project Inquiry

This field is for validation purposes and should be left unchanged.

Subscribe to our
newsletters

By signing up, you are agreeing to our Privacy Policy

“*” Indicates required fields

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Choose a Newsletter:*

Subscribe to our
newsletters

By signing up, you are agreeing to our Privacy Policy

“*” Indicates required fields

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Choose a Newsletter:*